The Patch Report: May 1961

In October 1960 the National Air Traffic Control Planning Group was set up with the following terms of reference and membership:-

(a) To undertake a study of what is required for a joint civil/military Air Traffic Control System in the period 1 965-1 975, taking into account : –

An assessment of the detailed operational requirements of the different airspace users;

System planning and evaluation;

Research, development and scientific studies;

An assessment of manpower and training requirements ;

An estimate of the broad order of costs.

(b) To outline the action to be taken to introduce their recommendations, particularly as regards the timing of the development and provision of equipment.

(c) To report to the Air Traffic Control Board within six months.

The report can be found here

PATCH REPORT MAY 1961

Barry Davidson sent me a link to a Flight article   describing the forthcoming changes at least in part triggered by the Patch Report

ATC Development : the British Plan (1962)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s